| 

How to Run Divers Clipped on With Long Leads

Category: fishing tips

 Jul 29th, 2019 by Keith Worrall 

Modified Jul 29th, 2019 at 10:35 AM

Adam Weese

Ok guys here is a video on how I run my divers clipped on so I can run long leads..

My braid divers are 40lb braid with 40′ of 30lb fluorocarbon leader so I don’t run snubbers with them..

My wire divers are 7 strand Torpedo wire with 100′ of 40lb braid tied to them so I can clip the divers on.. I run a snubber on these setups just ahead of the spin doctor or paddle.. If I have a spoon on it I add a 6′ leader after the snubber to the spoon..

I should have added I can take no credit for coming up with this.. This technique was shown to me by Yvan Charrois of Get it Wet sportfishing

https://www.facebook.com/groups/1364672780212116/permalink/2639918549354193/

 

 

More like this